juli 2011, nieuwe stafgebouw is bijna klaar
Aanpassingen en verbouwing aan Secondary School

Wilde Ganzen keurt aanpassingen en verbouwingen goed op de Secondary School. Hieronder een overzicht daarvan.

De begroting is € 41.000. De financiering is door de steun van Wilde Ganzen rond.

De bouw zal in het 4e kwartaal van 2010 starten.

Detailed description of activities to be carried out with the project budget

1.
Overrun on original proposal of the construction of the Andersen
Secondary School, see final "verantwoording Budget SEC en
VTC 2e fase april 2009"

2.
bicycle stand 8x4 meters, consisting of posts and a shadenet

3. mounting extra shelves in Chemistry room and
storeroom.

4. 3 watertanks, 2000 and 5000 liters, supporting
construction of posts and piping to connect to main
watersupply.

5. 1 watertank 5000 liter for drinking water, a
supporting construction of concrete and piping to
connect to shutter.

6. Manholes and piping for carting water away on the
school area and connecting to shutters

7. a water basin of 15 x 20 meters to store rainwater
for drinking water, cleaning and watering the gardens

8. installation of 1 extra window in each classroom

9. 2 storerooms, 2 rooms for heads of departments
and a small classroom. Building size 15 x 9 meters.
Shelves, cupboards and furniture

10. bycicles for staff

11. Cupboard for TV,DVD, mounting a solarpanel and
installation of equipment to receive signals, satelite
receiver and electronics to charge the battery.

12. volleyballnet and 10 balls

13. mount water fountain, including piping and
connecting to sewage and watersupply next to
kitchen and toilets.

14. 2 pits for sewage water with concrete cover

15. laptop

16. mounting shelves in all classrooms for storing
books and stationary of students. 14 meters, 35 cm
p/student

17. bulletin boards including mounting